Skip to content

Rolling Summer Closures For Pattullo Bridge Start This Weekend

Surrey/New Westminster – We knew this was coming. We have had advance warning. The rolling summer closures to refurbish the 70+ year old Pattullo Bridge start this weekend.

The bridge will close from the evening on April 29 (8 p.m.) to the morning of May 2 (5 a.m.) to allow crews to set up for construction work. The bridge will also close from the evening of Sept. 30 (8 p.m.) to the morning of Oct. 3 (5 a.m.) for crews to remove equipment.

From May 2 to Sept. 30, the bridge will remain open with one lane in each direction.

There will be truck access.

The bridge will be closed to all traffic two nights a week and one weekend a month.

Pedestrians and cyclists will still be able to use the bridge, even during evening and weekend closures.

Minor vehicle incidents on the bridge will cause significant delays and potentially a full bridge closure.

 

Share This:

2025 Teri Westerby – NDP – Chilliwack-Hope

Stampeders 2025 Tour

Unique Thrifting

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

RockIt Boy – Led Zepagain 2025

Exposure Events Chilliwack Expo 2025

Exposure Events Abbotsford Expo 2025

all-about-expos-A Taste of the Valley

2024 Hope Fog Fest

Community Futures

On Key

Related Posts