Skip to content

Public Grand Opening Of Abbotsford Salton Pedestrian/Cycling Bridge Wednesday January 23

Abbotsford – The grand opening of the Salton Pedestrian/Cycling Bridge in Abbotsford, connecting the city with UFV will be Wednesday January 23 at 1PM.

Last October, as we were sleeping off the BC municipal election results, A stretch of Highway 1 in Abbotsford was closed to traffic for the installation of the new pedestrian cycle bridge that allows you to cross the Highway at Salton Road. Access to UFV from King Road to Marshall Road is now a reality.

The FVN story of the construction can be found here.

The FVN story on the overpass approval can be found here.

Courtesy City of Abbotsford

Share This:

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

Community Futures

Stampeders 2025 Tour

2025 Teri Westerby – NDP – Chilliwack-Hope

Unique Thrifting

RockIt Boy – Led Zepagain 2025

Exposure Events Chilliwack Expo 2025

Exposure Events Abbotsford Expo 2025

all-about-expos-A Taste of the Valley

2024 Hope Fog Fest

On Key

Related Posts