Skip to content

Single-Lane-Alternating Traffic on Highway 7 near Mission – September 13 to 16

Mission- Drivers are advised of an upcoming lane closure on Highway 7 between Murray Street and Stave Lake Street as construction continues to improve the commercial truck route through Mission.

Highway 7 will be reduced to single-lane-alternating traffic between Murray and Stave Lake streets from 7:30 p.m. Friday, Sept. 13 through 5 a.m. Monday, Sept. 16.

The work is necessary to stabilize the slope on the bank below the highway and improve the road structure. The project’s complexity requires this lane closure over multiple days. A construction-zone speed limit will be in effect. Drivers must obey all signage and traffic-control personnel.

Drivers can expect delays and should plan extra time or choose an alternative route.

For updates, check: https://www.drivebc.ca/

Share This:

2026 Chilliwack Hoedown for Hospice

Exposure Events Chilliwack Expo 2026

Exposure Events Abbotsford Expo 2025

American Rock Legens Seger Fogerty RockItBoy Entertainment

RockIt Boy Entertainment Mr Crowley Ozzy Tribute 2026

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

Community Futures

Unique Thrifting

fighter-vodka-deep-blue-distilleries

On Key

Related Posts