Skip to content

Cultus Lake – Sweltzer Creek Pedestrian Bridge Replacement – Notice of Closure

Cultus Lake – Sweltzer Creek Pedestrian Bridge is expected to be closed, Thursday, Nov 7th at 8:00 am until the end of day on November 20th or until the bridge replacement project is completed. The pedestrian bridge crossing Sweltzer Creek, connecting the west side to Main Beach, will be replaced with a new 100-foot clear-span aluminum bridge with larger concrete abutments. Construction will take place per environmental permitting granted to protect fish habitat during construction.

Should you have any questions, please contact Todd Mckay, Manager of Park Operations, 604-847-2043 or email todd.mckay@cultuslake.bc.ca

2024 Cultus Lake Westside footbridge connecting Lakeshore Drive and Main Beach – Google Earth

Share This:

Steven Just for Council – 2026 Municipal Election

Rock.It Boy Entertainment – The Rod Show, The Stolen Cars

2026 AbbyCat Daddy 50/50 Draw Fall

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

Coast Valley Markets 2026

2026 Chilliwack Hoedown for Hospice

Exposure Events Chilliwack Expo 2026

American Rock Legens Seger Fogerty RockItBoy Entertainment

Unique Thrifting

fighter-vodka-deep-blue-distilleries

On Key

Related Posts