Skip to content

Rolling Summer Closures For Pattullo Bridge Start This Weekend

Surrey/New Westminster – We knew this was coming. We have had advance warning. The rolling summer closures to refurbish the 70+ year old Pattullo Bridge start this weekend.

The bridge will close from the evening on April 29 (8 p.m.) to the morning of May 2 (5 a.m.) to allow crews to set up for construction work. The bridge will also close from the evening of Sept. 30 (8 p.m.) to the morning of Oct. 3 (5 a.m.) for crews to remove equipment.

From May 2 to Sept. 30, the bridge will remain open with one lane in each direction.

There will be truck access.

The bridge will be closed to all traffic two nights a week and one weekend a month.

Pedestrians and cyclists will still be able to use the bridge, even during evening and weekend closures.

Minor vehicle incidents on the bridge will cause significant delays and potentially a full bridge closure.

 

Share This:

2026 Chilliwack Hoedown for Hospice

Exposure Events Chilliwack Expo 2026

Exposure Events Abbotsford Expo 2025

American Rock Legens Seger Fogerty RockItBoy Entertainment

RockIt Boy Entertainment Mr Crowley Ozzy Tribute 2026

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

Community Futures

Unique Thrifting

fighter-vodka-deep-blue-distilleries

On Key

Related Posts