Skip to content

Island 22 Boat Launch Blocked to Allow Flood Repair Work and Silt Removal

Island 22 – The potholes at Island 22 have, for the most part, been graded and filled in.

However, boaters beware – some areas of Island 22 Boat Launch have been blocked to allow repair work and silt removal.

Two areas are available for launching.

River conditions are changeable and launch conditions are currently very soft.

Island 22 March 2022 Post Flood Repair Work/City of Chillliwack

Share This:

2025 Teri Westerby – NDP – Chilliwack-Hope

Stampeders 2025 Tour

Unique Thrifting

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

RockIt Boy – Led Zepagain 2025

Exposure Events Chilliwack Expo 2025

Exposure Events Abbotsford Expo 2025

all-about-expos-A Taste of the Valley

2024 Hope Fog Fest

Community Futures

On Key

Related Posts