Chilliwack – This summer from Mid-June through August, Enbridge crews will be replacing about 1km of 30 and 36 inch natural gas pipeline. This will be in Southwest Chilliwack with the grid being between Evans and Lickman roads to the East and West and from North to South, Sumas Central and South Sumas Road.
Local residents will see an increase in truck traffic in the area.
