Skip to content

Weekend Detour Set For 104 Avenue East of Golden Ears Connector

Surrey – A detour will be in effect for motorists destined for Barnston Island and Surrey Bend Park from 7 a.m. on Saturday, Nov. 16, until 3 p.m. on Sunday, Nov. 17, 2019.

This detour will allow construction work to be completed at the Golden Ears connector/104 Avenue rail crossing.

Drivers will detour via 179th Street and Trigg Road and are advised to plan for extra time. Access will be maintained for cyclists and pedestrians.

All travellers are reminded to obey signs, watch for workers and traffic control personnel, and check @DriveBC on Twitter for the most up-to-date highway travel information or www.DriveBC.ca

Google Maps

Share This:

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

Community Futures

Stampeders 2025 Tour

2025 Teri Westerby – NDP – Chilliwack-Hope

Unique Thrifting

RockIt Boy – Led Zepagain 2025

Exposure Events Chilliwack Expo 2025

Exposure Events Abbotsford Expo 2025

all-about-expos-A Taste of the Valley

2024 Hope Fog Fest

On Key

Related Posts