Skip to content

Nightly Lane Closures On Alex Fraser Bridge, August 6 To 18 – Installing HOV Lanes

Richmond/Delta/Surrey/New Westminster — Drivers are advised that two lanes, one in each direction, will be closed nightly beginning Tuesday, Aug. 6.

The closures are expected to be ongoing until August 18 and will allow crews to continue working on improving capacity to the Alex Fraser Bridge with an additional lane and moveable barrier system. Crews will remove the southbound painted lines and then begin applying the permanent lane lines.

Drivers are reminded that the maximum speed limit on the bridge is now 70 km/h.

For the most up-to-date highway travel information, people should continue to check @DriveBC on Twitter and: DriveBC.ca

Share This:

Exposure Events Chilliwack Expo 2026

Exposure Events Abbotsford Expo 2025

American Rock Legens Seger Fogerty RockItBoy Entertainment

RockIt Boy Entertainment Mr Crowley Ozzy Tribute 2026

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

Community Futures

Unique Thrifting

fighter-vodka-deep-blue-distilleries

all-about-expos-A Taste of the Valley

On Key

Related Posts