Skip to content

Monday Night Road Closures For Agassiz-Rosedale Bridge On Highway 9 – Seismic Upgrades

Agassiz/Rosedale – Drivers are advised that the Agassiz-Rosedale Bridge on Highway 9 will require two closures of 20 minutes each during the night on Monday, February 25, for seismic and safety upgrade work.

The closures are expected to take place between 10 p.m. and 5 a.m. Watch for signage and obey all traffic control personnel on-site.

The ministry appreciates people’s patience while this work is done to strengthen the bridge and bring it up to modern seismic standards.

For travel information available 24/7, visit: www.DriveBC.ca

Share This:

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

Community Futures

Stampeders 2025 Tour

2025 Teri Westerby – NDP – Chilliwack-Hope

Unique Thrifting

RockIt Boy – Led Zepagain 2025

Exposure Events Chilliwack Expo 2025

Exposure Events Abbotsford Expo 2025

all-about-expos-A Taste of the Valley

2024 Hope Fog Fest

On Key

Related Posts