Skip to content

Construction Delays on Coquihalla Between Hope and Merritt

Coquihalla – Travellers using Highway 5 (Coquihalla) between Hope and Merritt should prepare for significant delays during B.C. Day long weekend.

A section of Highway 5 between Exit 250 and Exit 256 is undergoing major drainage construction. Lane closures will be in place in the area due to hazards within the closed lane and cannot be removed during the long weekend.

With increased holiday traffic, the ongoing closure of Highway 1, wildfire activity and evacuations affecting other major routes, traffic volumes on the Coquihalla are expected to be much higher than normal, particularly on Friday, July 31, 2026, and Monday, Aug. 3, 2026.

People travelling during the long weekend should have a plan.

  • Expect significant delays.
  • Ensure the vehicle has a full tank of fuel before departing.
  • Carry plenty of drinking water, snacks and food.
  • Allow extra travel time.

For up-to-date information about road conditions, visit: https://DriveBC.ca

Share This:

2026 Lisa Morry Municipal Election

Steven Just for Council – 2026 Municipal Election

Rock.It Boy Entertainment – The Rod Show, The Stolen Cars

2026 AbbyCat Daddy 50/50 Draw Fall

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

Coast Valley Markets 2026

2026 Chilliwack Hoedown for Hospice

Exposure Events Chilliwack Expo 2026

American Rock Legens Seger Fogerty RockItBoy Entertainment

Unique Thrifting

fighter-vodka-deep-blue-distilleries

On Key

Related Posts