Skip to content

4:30PM Monday UPDATE – WB Lanes Remain Closed on Highway 1 at Herrling Island After Semi “Dangling Over Rail Lines”

Popkum (with files from DriveBC and Skilled Truckers Canada) – UPDATE – DriveBC reported that one lane was open westbound at Herrling Island. however both lanes as of 4:30 PM are again closed.

#BCHwy1 westbound is CLOSED at Herrling Island for a vehicle recovery. Detour on #BCHwy7. Expect delays

ORIGINAL STORY – A multi-vehicle collision involving a semi-truck prompted a call to stop train traffic between Hope and Chilliwack Monday afternoon (1:30PM September 29)

Skilled Truckers Canada reports that the tractor-trailer unit was down an embankment on Highway 1 and ‘dangling’ over the railway lines. Rail service has been halted.

The westbound lanes of the highway were also expected to be closed for a “considerable time.”

The truck that went over the embankment had knocked down hydro and/or communication lines, according to first responders on the scene. Heavy haulers were being called to remove the truck. Two pick-up trucks were also involved and required towing. There are reports that three patients are being treated for injury.

DriveBC says there is no timetable for re-opening.

2025 Highway 1 Semi Dangling Over Rail Lines at Herrling Island – Skilled Truckers Canada – September 29 Facebook

Share This:

2026 Chilliwack Hoedown for Hospice

Exposure Events Chilliwack Expo 2026

Exposure Events Abbotsford Expo 2025

American Rock Legens Seger Fogerty RockItBoy Entertainment

RockIt Boy Entertainment Mr Crowley Ozzy Tribute 2026

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

Community Futures

Unique Thrifting

fighter-vodka-deep-blue-distilleries

On Key

Related Posts