Coquihalla – 8 PM Saturday – The Coquihalla is now open in both directions! Please travel safe this evening, and note there still remains a fast lane closure in both directions on snowshed hill.
The Coquihalla is now open in both directions! Please travel safe this evening, and note there still remains a fast lane closure in both directions on snowshed hill. #BCHwy5 @DriveBC https://t.co/7hnHKyju4K
— YRB Nicola Ltd (@YRBNicola) June 8, 2025
4PM Saturday UPDATE – CoquihallaHwy – UPDATE – The highway remains closed in both directions between #HopeBC and #MerrittBC. DriveBC is expecting the road to open some time Saturday evening. Stay tuned for updates.
⛔️#CoquihallaHwy – UPDATE – The highway remains closed in both directions between #HopeBC and #MerrittBC.
— DriveBC (@DriveBC) June 7, 2025
We are expecting the road to open some time this evening. Stay tuned for updates.
ℹ️https://t.co/3teLZR1n3a
ℹ️https://t.co/XF3jOwmoV1 pic.twitter.com/nByqWSxxXk
10 AM Saturday Update – Drive BC – #BCHwy5 remains closed in BOTH DIRECTIONS between #HopeBC and #Merritt due to emergency sink hole repairs. Next update is 4:00 PM PDT Saturday. Please note this is NOT an estimated time of reopening.
⛔️ REMINDER – #BCHwy5 remains closed in BOTH DIRECTIONS between #HopeBC and #Merritt due to emergency sink hole repairs. Next update is 4:00 PM PDT. Please note this is NOT an estimated time of reopening. #Coquihalla pic.twitter.com/6qCkoDiwpr
— DriveBC (@DriveBC) June 7, 2025
Friday Update – On Thursday evening, a sinkhole in the northbound lane on the Coquihalla, shut down that direction between Hope and Marritt.
It grew progressively worse on Friday. According to CityNews 1130 , a pipeline issue caused the problem under the highway.
The highway will be closed in both directions between #Merritt and #HopeBC due to emergency sink hole repairs.
From DriveBC 4:30PM Friday – Highway 5 (Coquihalla South), southbound. Road construction work planned between Exit 217: Zopkios Brake Check and Exit 202: Portia (2 km south of Great Bear Snowshed). Starting Fri Jun 6 at 9:00 PM PDT. Road closure planned. Assessment planned. Urgent sink hole repairs needed. Southbound closed Merritt to Hope. Use Highway 1 or 3 as alternates. No commercial vehicles on Highway 8. Next update time Sat Jun 7 at 10:00 AM PDT. Last updated Fri Jun 6 at 3:19 PM PDT. (DBC-77674)

2025 Fraser Valley Road Report Tam Hagan Facebook
Coquihalla Great Bear Snowshed – South Highway 5 at the Great Bear Snowshed, looking south June 2025