Skip to content

July 19 to 22 – Plan for Single-Lane-Alternating Traffic on Highway 7 Near Mission

Mission – Drivers are advised of an upcoming lane closure on Highway 7 between Murray Street and Stave Lake Street as construction continues to improve the commercial truck route through Mission.

Highway 7 will be reduced to single-lane-alternating traffic between Murray and Stave Lake streets from 7:30 p.m. Friday, July 19, through 5 a.m., Monday, July 22, 2024.

The work is necessary to stabilize the slope on the bank below the highway. The complexity of the project requires this lane closure over multiple days. A construction-zone speed limit will be in effect and drivers must obey all signage and traffic control personnel.

Drivers can expect delays and should plan extra time or choose an alternative route.

For updates, check: https://www.drivebc.ca/

Share This:

2025 Teri Westerby – NDP – Chilliwack-Hope

Stampeders 2025 Tour

Unique Thrifting

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

RockIt Boy – Led Zepagain 2025

Exposure Events Chilliwack Expo 2025

Exposure Events Abbotsford Expo 2025

all-about-expos-A Taste of the Valley

2024 Hope Fog Fest

Community Futures

On Key

Related Posts