Skip to content

Chilliwack – Night Paving – Vedder Road from Luckakuck to Knight from August 29 to September 1

Chilliwack – Vedder Road from Luckakuck Way to Knight Road will be repaved. Work is scheduled to begin Tuesday, August 29 and will be performed at night, 7 pm – 7 am. Construction is expected to span 3 to 4 nights between August 29 to September 8. Mobilization to the site will begin as soon as Friday, August 25. Expect delays and obey all traffic control devices and personnel.

The work is to address the deterioration of the existing asphalt and to re-establish the existing paving markings.

Details: https://loom.ly/vPooS6s

Share This:

fighter-vodka-deep-blue-distilleries

lakehouse-productions-all-you-need-is-love

a-night-of-bowie-truly-tina-mur-man-productions

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

Community Futures

Unique Thrifting

RockIt Boy – Led Zepagain 2025

Exposure Events Chilliwack Expo 2025

Exposure Events Abbotsford Expo 2025

all-about-expos-A Taste of the Valley

On Key

Related Posts

2025 Annual Poppy Campaign

Fraser Valley – (Royal Canadian Legion Branch 295 Chilliwack-Vedder) – The Legion’s 2025 National Poppy Campaign has launched, and volunteers across the country are ramping