Skip to content

City of Chilliwack Post Flood Repair Work – Peach Creek Bridge, Bridlewood Stairs

Chilliwack – Note two closures on local Chilliwack trails are coming up.

Peach Creek Bridge Replacement

The bridge over Peach Creek on the Vedder Rotary Trail is being replaced next week (April 4-8).

The bridge will be closed for this work, but the trails around it are open.

Bridlewood Stairs Replacement

The stairs from Chilliwack Lake Road up to Promontory will be closed starting April 4, for approximately 3 weeks.

The old wooden stairs will be replaced with new composite stairs.

The composite stairs are more durable and have a longer lifespan.

Share This:

2026 Lisa Morry Municipal Election

2026 Ghazaleh Nozamani Municipal Election

Steven Just for Council – 2026 Municipal Election

2026 Patricia Ross Election Ad

Rock.It Boy Entertainment – The Rod Show, The Stolen Cars

2026 AbbyCat Daddy 50/50 Draw Fall

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

Coast Valley Markets 2026

2026 Chilliwack Hoedown for Hospice

Exposure Events Chilliwack Expo 2026

American Rock Legens Seger Fogerty RockItBoy Entertainment

fighter-vodka-deep-blue-distilleries

On Key

Related Posts