Skip to content

City of Chilliwack Post Flood Repair Work – Peach Creek Bridge, Bridlewood Stairs

Chilliwack – Note two closures on local Chilliwack trails are coming up.

Peach Creek Bridge Replacement

The bridge over Peach Creek on the Vedder Rotary Trail is being replaced next week (April 4-8).

The bridge will be closed for this work, but the trails around it are open.

Bridlewood Stairs Replacement

The stairs from Chilliwack Lake Road up to Promontory will be closed starting April 4, for approximately 3 weeks.

The old wooden stairs will be replaced with new composite stairs.

The composite stairs are more durable and have a longer lifespan.

Share This:

Stampeders 2025 Tour

Unique Thrifting

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

RockIt Boy – Led Zepagain 2025

Steelin In The Years March 28 Chilliwack Cultural Centre

Exposure Events Chilliwack Expo 2025

Exposure Events Abbotsford Expo 2025

all-about-expos-A Taste of the Valley

2024 Hope Fog Fest

Community Futures

On Key

Related Posts