Skip to content

Mission Post Flood Restoration Update for Wren Street

Mission – During a recent storm event, 8100 Block Wren Street sustained significant damage.  One lane of road dropped approximately one-meter over a hundred-meter span. The slope adjacent to the road will need to be stabilized and the sanitary force main repaired before re-establishing the roadway. The road failure is currently being evaluated by a geotechnical engineer to determine the appropriate repair.

Timeline

City staff will review the recommendation from the geotechnical engineer in early January. The type of repair and availability of contractors will determine the timeframe of construction. An update will be provided in January.

What to expect

Detour routes are in effect, so plan accordingly. Watch for pedestrians and respect speed limits in the detour neighborhoods. Every effort will be made to keep the inconvenience to the residents to a minimum. Your patience and understanding while these works complete is very much appreciated.

Current Detour in Place

https://www.mission.ca/wp-content/uploads/Wren-St-Detour-Map.jpg

Share This:

Simon Gibson Election Ad 2022

Willow Reichelt Election Ad 2022

Shirley Wilson Election Ad Abbotsford School Trustee

2022 Patricia Ross Election Ad

Barlynn Cleaning Services

604 392 5834

Locks Pharmacy

BCGEU

Small Business BC

Community Futures

Diabetes Association

Chill TV

Unique Thrifting

fvn

Error, no Advert ID set! Check your syntax!
Error, no Advert ID set! Check your syntax!
Error, no Advert ID set! Check your syntax!
On Key

Related Posts