Skip to content

Abbotsford Gets A Small Break With Weather- Levee Idea On Hold – Patch the Dyke System (VIDEO)

Abbotsford – Abbotsford City Councilor Dave Loewen said it best after the Friday 2PM Media Briefing.

The Levee option has been dropped. Direct repairs to the breach itself are now underway, possible because water level on both sides have equalized.Fraser River needs to drop another 18 inches. When that happens, the floodgates can be opened, which will release 7x more water than the pumps can move.

On Thursday when the military deployed the first of 120 soldiers, it was thought that a number of properties would be sacrificed for the construction of a levee. The military would aid local officials and crew in the construction.

November 19, 2021, 4PMCrews are working hard to repair the Sumas Dyke at Number 4 and Marion Road. It is anticipated to be completed by early next week.

Photos: City of Abbotsford

The media conference can be reviewed here.

Share This:

CFC Chilliwack FC

Valley and Canyon Dispatch

Chilliwack Jets

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

abbyTV

Chill TV

Small Business BC

Community Futures

Unique Thrifting

On Key

Related Posts