Skip to content

Mission Bridge (Highway 11 Mission to Abbotsford) Inspection Work – Lane Closures August 3 to 6 – Thursday NIGHT – One Hour FULL CLOSURE at 9PM

Mission/Abbotsford – Drivers are advised that Mission Bridge on Highway 11 will have one northbound lane and one southbound lane closed to traffic early tomorrow morning as a detailed inspection of the bridge takes place.

The bridge inspection truck went to the site at 5AM on Tuesday, August 3 and will be there until the 6th.

Two lanes of the four-lane bridge will remain open to single-lane traffic.

The Mission-Abbotsford Bridge will be closed to ALL TRAFFIC in both directions Thursday night (Aug. 5) between 9 p.m. and 10 p.m.

After the detailed inspection has concluded, a repair plan will be made. The northbound lane of the bridge will remain closed throughout this process. Additional traffic management may be required when the repairs are carried out.

Drivers are encouraged to consider alternative routes and are reminded to observe posted speed limits. For the most up-to-date information before travel, visit: www.DriveBC.ca

Share This:

CFC Chilliwack FC

Valley and Canyon Dispatch

Chilliwack Jets

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

abbyTV

Chill TV

Small Business BC

Community Futures

Unique Thrifting

On Key

Related Posts