Mission/Abbotsford – Drivers are advised that Mission Bridge on Highway 11 will have one northbound lane and one southbound lane closed to traffic early tomorrow morning as a detailed inspection of the bridge takes place.
The bridge inspection truck went to the site at 5AM on Tuesday, August 3 and will be there until the 6th.
Two lanes of the four-lane bridge will remain open to single-lane traffic.
The Mission-Abbotsford Bridge will be closed to ALL TRAFFIC in both directions Thursday night (Aug. 5) between 9 p.m. and 10 p.m.
After the detailed inspection has concluded, a repair plan will be made. The northbound lane of the bridge will remain closed throughout this process. Additional traffic management may be required when the repairs are carried out.
Drivers are encouraged to consider alternative routes and are reminded to observe posted speed limits. For the most up-to-date information before travel, visit: www.DriveBC.ca
THIS WEEK: Aug 3-6th on #BCHwy11 on the #Mission Bridge.
— Emil Anderson Maintenance | Fraser Valley (@EAMOperations) August 3, 2021
⚠️FASTLANE CLOSED – BOTH DIRECTIONS
⚠️SPEED REDUCED – 60 KM/HR
⏰EXPECT DELAYS – LEAVE EARLY
#ConeZoneBC
Bridge Inspections & Repairs ongoing – thank you for your patience!@DriveBC @TranBC @NEWS1130Traffic @FraserVN pic.twitter.com/dfOcHqtD7X