Skip to content

Upcoming Lane Closures For Highway 11 Resurfacing Near Mission Bridge

Abbotsford/Mission- Weekend work will begin in the northbound and southbound slow lanes on Highway 11 between Harris Road and the Mission Bridge on June 7.

Lane closures will be in effect on Fridays from 8 p.m. to Mondays at 5 a.m. until approximately mid-July, weather permitting.

Motorists are asked to plan their trips in advance and allow for additional travel time, particularly in these peak traffic hours:

* Southbound: Saturdays 10 a.m. to 3 p.m., and Sundays 11 a.m. to 3 p.m.

* Northbound: Saturdays noon to 5 p.m., and Sundays 1 p.m. to 5 p.m.

Travellers are asked to follow signs, obey posted speed limits and watch for traffic control personnel and workers.

For up-to-date traffic information, visit: www.DriveBC.ca (http://www.drivebc.ca/) or follow @DriveBC on Twitter.

Share This:

CFC Chilliwack FC

Valley and Canyon Dispatch

Chilliwack Jets

radiodon11@gmail.com fvn@shaw.ca 604 392 5834

abbyTV

Chill TV

Small Business BC

Community Futures

Unique Thrifting

On Key

Related Posts